RB/36 channel - 1148 Akkaraipattu Irrigation


 
Date handed  over

20.03.2016

Agency - Akkaraipattu Irrigation 

 

After

Before
 


 

Comments

Popular posts from this blog

List of feasible Bridges

The following Bridges that can be Constructed            Name of Bridge DS Division ’; Decision of Join   Feasibility Study Report f Join Feasibility        Study Report 01 Neguna Ala Bandepara near the Sutharma house   Ampara Can be constructed (Details annexed). 02 Uhana Valikagakolla B44 to Hemethrurawa Mamedura Ala Uhana   Can be constructed (Details annexed). 03 Uhana Hahadda Kosyaya Dhama Uhana Can be constructed   (Details annexed). 04 Panamadu Bakkiella Bridge I   Porativu Pattu Can be constructed (Details annexed). 05 Panamadu Bakkiella Bridge II Porativu Pattu Can be constructed (Details annexed).    06 Panamadu Bakkiella Bridge III Porativu Pattu ...

Pulliyadumadu bridge - 1657 Vavunativu PS

 Date Handed Over 02.11.2017 Agency       Vavunativu PS After Before

Rural Bridges Project

Rural Bridges Project  u Background :The Government of  Srilanka  has initiated the implementation                              of 1210 Nos. of Rural  Bridges,Island wide in three Phases on  a                               Turnkey   Basis. u Implementing Agency : Part of the project had been  implemented under three contractagreement by the former Ministry of  Economic Development. The balance part was assigned  to the Ministry of Provincial Councils and Local Government through   cabinet decision No:15/0519/605/009-dated 30-04-2015 .